District Wide Site Work & Parking Lot Maintenance
Scope of Work
The school sites listed below summarizes work either completed or planned for in the future. Site work includes maintenance or upgrades on parking lots, loading docks, sidewalks, retaining walls, erosion control, and/or courtyard work.
Andersen: Work pending for 2028
Anthony Middle School: Summer 2025, South parking lot completely redone, North parking lot partially redone with added landscaping curbing. Trash enclosure created, and drive lane seal-coated.
Anwatin: Work pending for 2028
Armatage: Summer 2024, loading dock drive lane completely redone. North parking lot at Main Entrance patched, crack-filled, chip-sealed, and fog-sealed.
Barton: Summer 2024, north parking lots work done. Upper lot patched, crack-filled, chip-sealed, and fog-sealed. Lower lot completely redone, including rock swale to handle drainage from upper lot, and valley gutter system to channel water to City storm sewer system.
Bethune: Work pending for 2028
Burroughs: Work pending for 2027.
Camden: Work pending for 2028
Cityview: Work pending for 2029
Davis Center: No work to parking lot planned as Blue Line construction anticipated to start soon.
Dowling: Summer 2024, north parking lot at Main Entrance completely redone, including new layout for bus turn-around area and sidewalk separating bus area from visitor parking area. Summer 2023, asphalt repairs were completed behind building where old construction trailer had been stored.
Edison: Work pending for 2028
Ella Baker: 2019 parking lots completely redone. Seal-coating pending for 2029.
Emerson: 2026 work planned for drive lane.
Field: 2023 renovations completed.
Folwell: Summer 2024, erosion at south playground area corrected, including new parking lot area completely regraded and repaved. Retaining wall constructed along west curb of playground area to control erosion into rain garden area. New stairway on north side of rain garden reconstructed.
Franklin: Summer 2026 north parking lot renovations to be done. South and east parking lots to be seal-coted.
Green Central: Work pending for 2029
Hale: Work pending for 2027 including renovations of NW parking lot and seal coating play areas, fixing cracked sidewalks, and bituminous between curbs and sidewalks.
Hall: 2025 complete renovation of parking lot completed
Hiawatha: Work pending for 2026 including major renovations to SW parking lot, seal coating bituminous in “U” area and along sidewalks.
Hmong Academy (Jordan Park): Summer 2023, north parking lot was completely redone, including subgrade. South parking lot was patched, crack-filled, chip-sealed, and fog-sealed.
Howe: Work pending for 2027 including seal coating parking lot, fixing cracked driveway apron, and sidewalk repairs.
Jenny Lind: Summer 2023, north east parking lot completely redone. West parking lot was patched, crack-filled, chip-sealed, and fog-sealed.
Justice Page: Partial replacement of parking lot done in 2022 by new entrance. 2020 seal coated. Work pending for 2029.
Keewaydin: Summer 2025, new retaining wall on south side by Door #2 and playground area erosion control completed. 2025 Courtyard completely redone including new draintile system and plantings. Summer 2024, retaining wall and water detention area constructed to handle erosion at main entrance area.
Kenwood: Summer 2024, north parking lot at Main Entrance patched, crack-filled, chip-sealed, and fog-sealed. South parking lot completely redone, including 30 foot long section of retaining wall reconstructed.
Lake Harriet Lower: 2014 repaved. Pending work 2029.
Lake Harriet Upper: Summer 2025 parking lot seal coating planned, including playground area and fixing stairs by Door 14.
Las Estrellas: Summer 2023, east parking lot and half of west parking lot was completely redone, including new concrete wheel stops. Bituminous between sidewalks and curbing was removed and replaced. North parking lot was patched, crack-filled, chip-sealed, and fog-sealed.
Longfellow: Work planned for summer 2027 after window replacement project is complete
Loring: 2020 north parking lot repaved. Sealcoating planned for 2029.
Lucy Laney: Summer 2024, north parking lot and west loading dock driveway completely redone. South parking lot patched, crack-filled, chip-sealed, and fog-sealed.
Lyndale: Summer 2019 parking lot seal coated and major sidewalk and cub repairs done. Sealcoating planned for 2029.
Marcy: Summer 2019 parking lot repaved. Sealcoating planned for 2028.
Maintenance & Operations Center: Spring 2024, east, west, and south parking lots completely redone, including new parking lot lighting and preparations for future EV Charging Stations.
Nellie Stone Johnson: Summer 2023, north parking lot was completely redone, including subgrade. South parking lot was patched, crack-filled, chip-sealed, and fog-sealed.
North HS: Parking lot work on hold for completion of CTE project. Field area had asphalt under bleachers redone in 2020.
Northeast MS: Work pending for 2027 including seal coating parking lots. Parking lot repairs also done including seal coating lot & playground area.
Northrop/Ericsson: Summer 2025 work completed on west side of building between curbs & sidewalks, and sidewalk replacements. 4, retaining wall and water detention area constructed to handle erosion at main entrance area.
Nutrition Center: Summer 2025, south and west parking lots replaced including concrete swale for drainage. East lot sealcoated.
Olson MS: Summer 2023, north parking lot and half of west parking lot was completely redone. South parking lot was patched, crack-filled, chip-sealed, and fog-sealed.
Pillsbury: 2019 dumpster area redone. Work planned for 2027 including fixing cracked concrete driveway apron and seal coating east parking lot.
Pratt: West parking lot seal coated in 2020. West parking lot scheduled for replacement in 2028, including fixing cracked sidewalks.
Roosevelt: Summer 2024, east parking lots patched, crack-filled, chip-sealed, and fog-sealed. Work also included sidewalk repairs along east and north sides of building.
Sanford: Summer 2025 parking lot seal-coated.
Seward: Summer 2019, playground area seal-coated.
South HS: Summer 2025, south lot completely replaced and east lot sealcoated.
Southwest HS: Major parking lot work needed, and door 6 stoop needed. On hold for pending mechanical system and chiller work to be completed.
Sullivan: Summer 2019, parking lot completely redone except playground area. Playground area scheduled for replacement 2029.
Transition Plus: Summer 2023, parking garage was swept and power washed. 2028 parking lot seal coated.
Transportation: Summer 2026, major parking lot work planned.
Waite Park: Summer 2023, south parking lot was completely redone. North parking lot was patched, crack-filled, chip-sealed, and fog-sealed. Playground area was seal-coated.
Washburn HS: Summer 2026, south lot replacement planned. North lot to be seal-coated 2029. Concrete by Door #5 cracked.
Webster: Work pending for 2027 including sealcoating parking lots and fixing cracked driveway apron.
Wenonah: Summer 2026, work planned including seal coating parking lot & play areas, and fixing loading dock area and concrete drive apron. Sidewalk work also planned.
Whittier: Summer 2024, corrections to existing retaining walls on south side of building done, including some sidewalk repairs.
Wilder: Parking lots sealcoated in 2020. New building addition done 2025.
Windom: Summer 2025, parking lots seal-coated.